A plain concrete driveway around Maitland, Cessnock and Port Stephens costs $95 to $130 per square metre supplied and laid, and exposed aggregate $130 to $185. This post turns those rates into dollar figures for the sizes people actually pour, adds the two costs most quotes leave off the front page, and shows how to test whether a quote in your hand is fair.

The short answer

  • Plain broom finish concrete costs $95 to $130 per m², supplied and laid.
  • Coloured concrete costs $115 to $160 per m² and exposed aggregate $130 to $185 per m².
  • A 36 m² single driveway in plain concrete is about $3,400 to $4,700. A 60 m² double in exposed aggregate is about $7,800 to $11,100.
  • Breaking out an old driveway first adds about $35 per m².
  • The council fee for the strip at the kerb is separate. Maitland publishes $435, Port Stephens $320, and Cessnock three items that add to $797.10.

By size and finish

DrivewayPlain broom finish$95 to $130 per m²Coloured concrete$115 to $160 per m²Exposed aggregate$130 to $185 per m²
Single, 3 m by 12 m36 m²$3,400 to $4,700$4,150 to $5,750$4,700 to $6,650
Double, 5 m by 12 m60 m²$5,700 to $7,800$6,900 to $9,600$7,800 to $11,100
Double with a turning bay85 m²$8,100 to $11,050$9,800 to $13,600$11,050 to $15,750
Long rural drive, 3 m by 50 m150 m²$14,250 to $19,500$17,250 to $24,000$19,500 to $27,750

Supplied and laid, rounded to the nearest $50. Removing an old driveway first adds about $35 per m². Rates on this site are guide figures for planning a budget. Your price is the written quote after the concreter has seen the block, and it can sit outside the guide where ground, access or a small area call for it.

Coloured concrete driveway with tooled joints meeting the kerb, East Maitland
Coloured concrete driveway with tooled joints meeting the kerb, East Maitland

Concrete driveway cost per m² by finish

Three finishes cover nearly every driveway poured in the Hunter, and each has its own guide rate, supplied and laid.

FinishGuide rate per m²What the extra buys
Plain broom finish$95 to $130Grey concrete brushed for grip. The baseline.
Coloured concrete$115 to $160Oxide through the whole load, so the colour runs the full depth.
Exposed aggregate$130 to $185Stone washed back through the surface. Hides tyre marks, grips when wet.

Supplied and laid means the lot on a normal site: trimming the ground, formwork, mesh on chairs, the concrete, placing, finishing and cutting the joints. It does not mean a pump where the truck cannot reach, a retaining edge on a steep block, or the council’s fee. Those come later in this post.

The finishes are described in full on the concrete driveways and exposed aggregate pages.

What a single, double or long driveway costs

The table at the top of this page multiplies the rates out for four common sizes. To place your own:

  • A single driveway is about 3 metres wide. From a garage set 12 metres back from the kerb that is 36 m², or about $3,400 to $4,700 in plain concrete.
  • A double driveway for a two car garage runs about 5 metres wide and 60 m², or $5,700 to $7,800 in plain and $7,800 to $11,100 in exposed aggregate.
  • A double with a turning bay or a pad for the boat is nearer 85 m².
  • A long drive on a rural block in Lochinvar, Greta or Medowie is where area runs away. Fifty metres at 3 metres wide is 150 m², which is $14,250 to $19,500 in plain concrete, and the reason long drives are nearly always plain.

Width at the street is capped by council, not by you. Maitland City Council allows a crossing of 3 metres for a single garage and up to 4.5 metres for a double. Cessnock City Council’s drawing allows 3 to 5.5 metres. Port Stephens Council caps a single at 3 metres and a double at 4. Inside the boundary the driveway can flare wider. For any other size, the calculator does the multiplication.

Rather have one figure than a range? Send the suburb and a rough size. A local concreter walks the block and quotes in writing, with the crossing and the council side spelt out.

Get a written quote Price my own size

What it costs to remove an old driveway

Breaking out the old slab, carting it to a recycler and correcting the ground underneath adds about $35 per m² to the new pour. On a 36 m² single driveway that is about $1,260. On a 60 m² double it is $2,100.

It is tempting to skip this and pour over the top. On the river clay under much of Maitland that copies the old failure into the new concrete and lifts every level at the garage and the kerb. The removal and replacement page explains what is usually found once the slab is up, and driveways on Hunter clay explains why the ground decides how long the new one lasts.

Council fees that sit on top of the quote

The strip between your boundary and the kerb belongs to council, and building, widening or replacing it needs approval under Section 138 of the Roads Act. Each council publishes its own fee for the 2026 to 2027 financial year.

CouncilApplicationPublished fee
Maitland City CouncilApplication for Vehicle Access Crossing (Driveway)$435, plus $170 if a second pre-pour inspection is needed
Cessnock City CouncilSection 138 application on the NSW Planning Portal$244 processing, $62 assessment and $491.10 inspections, $797.10 in all
Port Stephens CouncilDriveway Application Form$320 per residential crossing

These go to council, not to the concreter, and they are rarely inside a per m² rate. The Section 138 guide walks through each council’s process and what its inspector looks at.

The same fee schedules also show what each council charges when its own crews pour concrete. Maitland lists $560 per m² to restore a domestic concrete driveway. Cessnock lists $594 per m² for 125 mm plain concrete where council builds a crossing for an owner, and $5,052 for a 3.6 metre layback. Port Stephens lists $225 per m² for restoring a domestic driveway, with a minimum of $1,109.90. Those are charges for small areas of council work, not a market rate for a whole driveway. They do make one point clearly: the crossing is the dearest concrete on the job per metre. Maitland’s drawing asks for 125 mm of 32 MPa concrete there, and Cessnock’s for 125 mm of N32 on 150 mm of base, and both councils inspect it before the pour.

A worked example from quote to kerb

Take a house in Thornton with the builder’s single strip, about 30 m², and an owner who wants a 60 m² double driveway in exposed aggregate.

ItemSumGuide figure
New 60 m² driveway, exposed aggregate60 m² at $130 to $185$7,800 to $11,100
Remove the old 30 m² strip30 m² at about $35$1,050
Maitland City Council applicationpublished fee$435
All upabout $9,300 to $12,600

The same driveway in plain broom finish comes to about $7,200 to $9,300, a saving of roughly $2,100 to $3,300. Not in either figure: a pump if the truck cannot reach, a grated drain if the driveway falls towards the garage, or a street tree or stormwater pit in the way of the crossing.

What pushes a driveway quote up or down

  • The ground. Floodplain clay and builder’s fill need a base cut to firm material and compacted. Medowie and Nelson Bay sand needs its edges held in. More preparation is more money, and it is the last place to save.
  • Access. A truck that can chute straight into the formwork is the cheap case. A pump or a barrow run is a line on the quote.
  • Slope. A block that falls away needs benching, a thickened low edge or a small retaining edge.
  • Finish and stone. Plain to coloured to exposed, and within exposed the stone decides the top of the range.
  • Size. A small pour carries the same truck, crew and day as a large one, so its rate sits higher. Pouring a path, a patio or a shed slab the same day brings every rate down.
  • What parks on it. A caravan, a boat or a truck wants a thicker slab with heavier mesh.
  • What is in the way at the kerb. Maitland keeps a crossing 2 metres from a street tree and 600 mm from a stormwater pit, and its schedule lists $800 for street tree planting connected with a driveway.

Is my quote fair? Five checks

A question that turns up on renovation forums again and again runs like this: $16,000 for a driveway 16 metres by 6, is that fair? The honest answer is that it depends what the $16,000 buys, and five checks sort it out.

  1. Divide by the area. 16 by 6 is 96 m², so $16,000 is about $167 per m². That sits inside the guide range for exposed aggregate and above it for plain concrete.
  2. Match the finish. The same sum is a fair price for one finish and a dear one for another.
  3. Read what is written down. Thickness, mesh, concrete strength, base preparation and joint spacing should all be on the quote. If they are not, ask. The specification lists what each should say.
  4. Look for the three extras. Removal of the old slab, the crossing at the kerb and the council fee are either in the figure or they are coming later.
  5. Check the paperwork. The NSW Government’s guidance for homeowners is that a written contract is mandatory for work over $5,000, that the most a contractor can ask as a deposit is 10 percent, and that Home Building Compensation cover is required on jobs over $20,000 before any work starts or any money changes hands. It also says to look up the licence on Verify NSW first.

Two quotes a third apart are usually describing two different slabs. The cheaper one is nearly always thinner, or sitting on ground nobody prepared.

Ways to bring the price down without a thinner slab

  • Pour jobs together. One truck, one crew, one day, shared across the driveway, the side path and the shed slab.
  • Put the decorative finish where it is seen. Exposed aggregate from the garage door to the boundary, plain broom finish down the side and on the long run.
  • Sort the access first. A gate widened or a fence panel lifted out before the pour can save the cost of a pump.
  • Keep the crossing simple. A crossing set square to the kerb at the width council allows, clear of the tree and the pit, avoids the site-specific design that Maitland says takes 28 working days and is done at the applicant’s cost.

How these figures were put together

The per m² ranges are this site’s published guide rates for the Maitland, Cessnock and Port Stephens council areas. They are budgeting figures, the same ones used on every service page and in the calculator, and they are not quotes. Maitland Concrete Works is a referral service, so the figure that counts is the written quote from the independent concreter who visits the block.

Every council figure in this post was read from that council’s own page or fee schedule on 29 September 2026, and the links are below. The contract, deposit and cover rules were read from the NSW Government’s guidance for homeowners on 16 November 2026. Councils reset their fees each July, so check the current schedule before relying on a number here.

Questions

Driveway cost questions

How much does a concrete driveway cost per m² in Maitland in 2026?

Guide rates for Maitland, Cessnock and Port Stephens are $95 to $130 per m² for plain broom finish concrete, $115 to $160 for coloured concrete and $130 to $185 for exposed aggregate, all supplied and laid. Removing an old driveway first adds about $35 per m². These are budgeting figures. The price for a particular block is the written quote after a site visit, because ground, access and slope all move it.

How much is a double concrete driveway?

A double driveway of about 60 m² brackets at $5,700 to $7,800 in plain concrete, $6,900 to $9,600 in coloured concrete and $7,800 to $11,100 in exposed aggregate. Add a turning bay and the area is nearer 85 m², which is $8,100 to $11,050 in plain and $11,050 to $15,750 in exposed aggregate. The council's application fee for the crossing is on top.

How much dearer is exposed aggregate than plain concrete?

About $35 to $55 per m² at guide rates. On a 60 m² double driveway that is roughly $2,100 to $3,300 more than plain. The gap comes from the stone, the extra finishing work and the wash off the next day, and it widens with imported or specialty stone. Many owners use exposed aggregate at the front where it is seen and plain concrete down the side.

Does a driveway quote include the council crossing and approval?

It varies, so ask for it in writing. The crossing between your boundary and the kerb is usually priced with the driveway, but it is built to the council's drawing, which is thicker and stronger than the rest. The council's application fee is a separate cost paid to council. The quote should state who prepares the plans, who lodges the application and who books the inspection.

How soon can I drive on a new concrete driveway?

Most concreters ask for about a week before cars use a new driveway, and longer in cold or wet weather, because concrete keeps gaining strength for about four weeks. Maitland City Council's information kit asks that a new crossing be closed to traffic for seven days after the pour. Walking on it the next day is normally fine. The concreter who pours the job gives the figure for the mix and the conditions.

What does it cost to replace an existing driveway?

The new pour at the normal rate plus about $35 per m² for breaking out and carting the old slab. A 36 m² single driveway replaced in plain concrete brackets at roughly $4,700 to $5,900 all up. Replacing the strip at the kerb needs council approval in all three council areas even when it is like for like, so allow for the application fee as well.

Next step

Swap the range for your own figure

Maitland Concrete Works is a referral service. Each enquiry goes to one independent concreter working the Maitland, Cessnock and Port Stephens council areas, who visits the block, measures, quotes in writing and does the work.

Get it measured and quoted

Tell us what is being poured and the suburb. An independent local concreter rings you back to book the site visit.

Or ring (02) 4012 6377

Call (02) 4012 6377 Get a quote